Work began on clearing the area for the car park. The surplus soil was removed and taken to the churchyard extension.

The membrane was put in place and hard core put on top.

Then the grid was placed on top of that.

Finally the top soil was added and seeded.

Meanwhile, the area round the rooms was being finished. The paving was added near to the doors.