Tuesday, 28 February 2017


The slab was completed and had to be left for 7 days to 'cure' before anything could be loaded on it or work carried out.

The finished slab

Meanwhile the blocks were delivered.

The stone was cut and ready to be delivered.

On the last day of the month the bricklayers came and began to build the walls!


At the beginning of February the piles were all in place.

Then followed the preparation of the reinforced slab.


When the reinforcement was complete the cement lorry arrived and a pump was used to enable the cement to be spread evenly over the surface.

Spreading the cement